CIP Transport Institute

The designer of the reconstruction of Novi Sad railway station, whose preliminary design from February 2020 put the cost of reconstructing the station building, including the surrounding grounds, at around three million euros.

Affairs

  • Collapse of the canopy at Novi Sad railway station: Put the reconstruction of the station building at about three million euros in a cost estimate for the 2020 conceptual design
  • Stig–Kostolac railway: EPS paid for work that was never done: As technical supervisor of the railway construction, it signed reports certifying that works had been properly completed when they had not been carried out

People

  • Slaven Tica: general director of the CIP Transport Institute
  • Slobodan Naumović: lead structural designer, CIP Transportation Institute